|
Australia-VIC-BUNYIP Azienda Directories
|
Azienda News:
- DSA 293: Geotechnical Verified Report - California
For this Interim Verified Report: all geotechnical tests inspections (identified in section 3) required by the DSA-approved construction documents, associated with the above noted form DSA 152 inspection card section numbers, were performed
- DSA Procedure PR 13-01: Construction Oversight Process - DGS
DSA 1-MR: Application for New Manufactured Permanent Modular or Relocatable Buildings (when applicable), such as architects, structural engineers, mechanical engineers, electrical engineers and the geotechnical engineer of record
- 103-22 - Sacramento City Unified School District
GE – Indicates special inspection shall be performed by a registered geotechnical engineer or his her authorized representative, usually associated with the Laboratory of Record LOR – Indicates test or special inspection shall be performed by a testing laboratory accepted in the DSA Laboratory
- DSA 103-22: LISTING OF STRUCTURAL TESTS SPECIAL INSPECTIONS . . . - 4CD
geotechnical report for the following cases: A) free standing sign or scoreboard, B) cell or antenna towers and poles less than 35'-0" tall (e g , lighting poles, flag poles, poles supporting open mesh fences, etc ), C) single-story structure with dead load less than 5 psf (e g , open fabric shade structure),
- DSA-103 DSA File No. : 48-C1 Revised 5 8 2019 List of Required . . .
Project has a geotechnical report, or CDs indicate soils special inspection is required by GE Project does NOT have and does NOT require a geotechnical report DSA-103
- IR A-4:Geologic Hazard Report Requirements - California Department of . . .
All geologic hazard reports must be approved by CGS before DSA will stamp-out the plans and specifications for any project that requires a geologic hazards report School districts are responsible for submittal of reports to CGS and for the cost of review by CGS
- Forms - DGS
DSA 152 IPI: In-Plant Inspector Inspection Card Verified Report Link opens a document Sample Form (Note: Form DSA 152-IPI will be uploaded to DSAbox by DSA staff for use by applicable individuals in accordance with PR 13-01 )
- DSA File No. : 19-H15 Revised 5 8 2019 List of Required . . . - Bid Room
Generally, the structural tests and special inspections noted on this form are those that will be performed by the Geotechnical Engineer of Record, Laboratory of Record, or Special Inspector The actual complete test and inspection program must be performed as detailed on the DSA approved documents
- CHANGE IN DELEGATION OF RESPONSIBILITY - California
After project construction commences, an individual relieved of responsibility for observation of construction shall submit a “terminating” verified report (form DSA 6-AE: Architect Engineer Verified Report or, for a geotechnical engineer, form DSA 293: Geotechnical Verified Report
- PROCEDURE: CONSTRUCTION OVERSIGHT PROCESS - Rowland Unified School District
DSA 1-MR: Application for New Manufactured Permanent Modular or Relocatable Buildings (when applicable), such as architects, structural engineers, mechanical engineers, electrical engineers and the geotechnical engineer of record
|
|